Provide Permanent MODULAR Buildings with Office Space for 300 Additional Employees
USMGE was provided the opportunity to assist a Medical Supply Company that contributes to society by providing valued products and services in the healthcare market and by responding to the needs of patients and healthcare professionals. They are one of the world’s leading manufacturers of medical devices and supplies. They perform their own research and development, manufacturing, marketing, and distribution.
USMGE and its design services team assisted in providing a permanent space solution by adding (2) 5,000 sf modular buildings to provide office space for an additional 300 employees to accommodate a large expansion at an international medical supply center in Maryland.
USMGE’s turnkey solution included permitting and in doing so worked with the City Permitting Office to acquire the building permit in under 1 month.
As part of USMGE’s turnkey services a permanent foundation was installed along with the building’s electrical MDP Panels and connections, as well as all required ADA deck, steps, and ramps.
The buildings were equipped with complete HVAC systems, all electrical components, and low voltage conduits. The interior finishes included upgraded carpet tiles, VCG on the interior walls and T-grid ceiling systems. The roofing systems were black EPDM, and the exteriors were Hardie Panel with a mansard. The modular buildings exteriors were designed to match the existing main campus buildings in appearance. The (2) buildings were installed in 4 weeks without any interruptions to existing operations. These modular buildings will be in use for many years.
“I want to thank you and USMGE™ for the effort you put forth this summer to help us develop and deliver specialty locker room buildings for our new athletic complex. The modular units provided are outstanding and meet each of our requirements.As you know this was an especially challenging project due to the short duration of the project and the necessity to make the units compatible with our historic campus. Throughout the design and construction project, USMGE™ and you worked diligently to meed Hood's needs and the constraints of the site. We are very proud of the end product and USMGE™ should be also. thanks again for all your efforts.”
Published by US Modular Group East, Inc. | Contact Us Modern modular dispensary building with branded facade As the cannabis…
Learn MoreModular construction offers accelerated timelines and high-quality results—but a successful project begins with a well-prepared site. Whether you're installing a…